After my computer work this morning I made another trip down to Boulder and loaded another 1100 pounds of road base in my(solo) bucket brigade and then into the truck. Once back on home turf, I turned it around and unloaded the 1100 pounds of road base.
Then off to “regular” work. The trailer parking space is coming along slowly I’m about 24 6 x 6 landscape timbers in..and just over a ton of “fill”.
I figure I have about 1 more row of timbers to set, and maybe 6 to 8 loads of fill to go. Then I can move the utility trailer over, and begin work on Tori’s dog yard.






